Skip to main content
Levi Construction logo
Rhode Island & Eastern MA

Concrete Work Done Right for RI & MA Freeze-Thaw

Slabs, footings and flatwork poured with proper base, control joints and drainage so they resist cracking.

Or call (401) 258-1789

Get Your Free Estimate

  • 6 years of experience
  • Owner on every job
  • Free on-site estimates

Concrete Work

Concrete is only as good as what goes under it and how it is finished, and in Rhode Island and Massachusetts, the enemy is water and frost working into every weak point. Poorly based concrete cracks, spalls and heaves within a few winters, while concrete poured on a compacted, draining base with the right control joints holds for decades. Levi Construction does concrete flatwork and structural work with that difference built in: slabs, footings, pads and steps set on prepared bases, with control joints placed to steer the inevitable shrinkage into straight, planned lines instead of random cracks. Airton, the owner, is on the pour, because finishing concrete is a timing skill that cannot be handed off. We also handle the footings that our stone walls, steps and columns sit on. With 6 years of concrete and masonry across RI and MA, we pour concrete that is prepared for the climate, not fighting it.

Concrete work covers poured flatwork (slabs, pads, walkway and patio bases) and structural elements (footings and foundations for walls, steps and columns). Good concrete starts with a compacted, draining sub-base so water cannot collect and freeze underneath. Reinforcement such as rebar or wire mesh controls where the slab can move, and control joints, tooled or saw-cut at planned spacing, give shrinkage a straight line to follow so the slab does not crack randomly. Finishing and curing set the surface durability, and in New England the mix and air content are chosen so the surface resists the freeze-thaw and salt that spall lesser concrete.

Signs You Need Concrete Work

  • You need a slab or pad for a shed, AC unit, hot tub or equipment
  • An existing concrete surface is cracked, spalling or heaved
  • You need footings for a wall, columns, steps or a structure
  • You want a durable base poured before a paver or stone surface
  • Water is pooling or draining wrong across a concrete area
  • You are combining concrete flatwork with masonry or hardscape features

Materials & Options

  • Poured concrete slabs and pads
  • Footings and foundations below the frost line
  • Rebar and wire mesh reinforcement
  • Compacted, draining sub-base aggregate
  • Air-entrained mix suited to freeze-thaw and salt
  • Tooled or saw-cut control joints
  • Broom, float or exposed-aggregate finishes

How We Do It

  1. 01

    Plan the pour

    We confirm dimensions, thickness, reinforcement and where the concrete needs to drain, then give a free estimate with the scope spelled out.

  2. 02

    Prep the base

    We excavate, build and compact a draining sub-base, and set footings below the frost line, since what is under the slab decides whether it cracks and heaves.

  3. 03

    Form and reinforce

    We set the forms to grade and slope, place rebar or mesh, and confirm the pitch so surface water always drains away from structures.

  4. 04

    Pour and finish

    We pour, screed, float and finish with the surface texture you want, and tool or cut control joints at planned spacing so shrinkage cracks stay on the lines.

  5. 05

    Cure and clean up

    We cure the concrete properly for strength and freeze-thaw durability, strip forms, and clean the site.

Why Homeowners Choose Levi Construction

Base and joints done right

A draining sub-base and planned control joints are what keep concrete from cracking randomly and heaving. We treat both as the job, not an afterthought.

Poured for New England

We build below the frost line and use mixes suited to freeze-thaw and road salt, so the surface resists the spalling that ruins under-prepared concrete here.

Masonry and concrete together

As a masonry contractor we pour the footings our walls and steps sit on, so your hardscape and its concrete base are built by one crew to one standard.

Concrete Work: Common Questions

All concrete shrinks as it cures, so some movement is unavoidable. The goal is to control where it cracks, not to pretend it never will. We place control joints at planned spacing so shrinkage follows straight lines, build a draining base so water cannot freeze under the slab, and reinforce with rebar or mesh. That is the difference between hairline joints on a line and random cracks across a slab.

Get Your Free Concrete Work Estimate

Serving Rhode Island and Eastern Massachusetts. The owner is on every job.

WhatsAppCall usText usEmail us